cengiz_enerji_web_ic_sayfa_Termik_Sant

ACTIVE THERMAL POWER PLANTS AND PLANTS UNDER CONSTRUCTION;

With Samsun Natural Gas Combined Cycle Power Plant, a global energy investment, and CENAL Power Plant, installed capacity reaches 2,182 MW.

Total installed capacity of thermal power plants reached 2,182 MW with CENAL Power Plant at Karabiga. The Samsun Natural Gas Combined Cycle Power Plant, the most efficient plant in the world, was built with a total investment of USD 400 million and its flawless construction process has set an example for Turkey’s energy sector.

Active Plants
  • Samsun Natural Gas Cycle Power Plant 610 MW
  • Cengiz 240 Gas-Fueled Combined Cycle Power Plant 240 MW
  • Eti Alüminyum A.Ş. Cogeneration Power Plant 12 MW
  • CENAL Power Plant 1320 MW
GENERAL TOTAL: 2182 MW

Cengiz Enerji was established in 2000 with Cengiz Holding’s decision to invest in energy. The company is engaged in project management, consultancy, sales, marketing and distribution services as well as construction, installation and operation of standard or combined cycle power plants in addition to energy sales agreements.

Cengiz Enerji has 850 MW of licensed installed capacity with the following plants.

• Samsun 240 MW Combined Cycle Power Plant
• Samsun 600 MW Combined Cycle Power Plant

Completed and ongoing projects which include engineering, construction, assembly, installation and commissioning services are as follows.

Samsun Natural Gas Combined Cycle Power Plant

With an efficiency of 61%, Samsun Natural Gas Combined Cycle Power Plant is the most efficient and fastest built natural gas fired power plant of its kind in the world. The construction of the world’s most efficient natural gas-fired power plant was completed 9 months before schedule, breaking the record for the fastest built natural gas-fired power plant in the world. The Samsun Natural Gas Combined Cycle Power Plant was presented with the Grand Prize in the “Best Large-Scale Natural Gas Power Plant” category at the 2015 Powergen Europe Fair and Conference and also received the “Top Plant” award from POWER Magazine.

COMPLETED PROJECTS

• Cengiz Enerji’s Samsun 600 MW Combined Cycle Power Plant
• Cengiz Enerji’s Samsun 132 MW Combined Cycle Power Plant
• Cengiz Enerji’s Samsun 240 MW Combined Cycle Power Plant
• Eti Alüminyum A.Ş.’s 120 t/h Steam Generation Plant
• Eti Alüminyum A.Ş.’s 13 MW Cogeneration Power Plant
• Eti Bakır A.Ş.’s Murgul 20 MW Hydroelectric Power Plant
• Nuh Enerji’s 59 MW Combined Cycle Power Plant


cengiz-enerji

Title: Cengiz Enerji San. ve Tic. A.Ş.
Address: Altunizade Kısıklı Cad. No:37 34662 Üsküdar İSTANBUL / TURKEY
Telephone: +90 (216) 554 53 00 (Pbx)

Fax: +90 (216) 474 11 22
E-Mail: power@cengiz.com.tr
Web: www.cengizenerji.com.tr

Turkey's Ultra Super Critical Pulverized Coal Plant

CENAL Elektrik Üretim A.Ş., 50% of which is owned by Cengiz Holding A.Ş. and another 50% by Alarko Holding A.Ş., was established on 11.05.2011 for construction and operation of “CENAL Power Plant Fueled by Imported Coal with a Port, Ash Land Fill Site and Deep Sea Discharge Project” with an installed capacity of 1320 MWe (2X660 MWe) / 1380 MWm / 2926 MWt in Çanakkale’s Biga district, Karabiga town, Kadıoğlu on a space of 454,518 m² on parcel 6759 (formerly 5229 and 5230).

For this project, the “Environmental Impact Assessment Report” was issued by the Ministry of Environment and Urban Planning with the number 2506 on 09.05.2012 and “Production License” was issued by the Energy Market Regulatory Authority with the number EÜ/4315-42/02574 on 20.03.2013.

The plant was designed for operating 7500 hours a year and a gross annual power production of 9,900,000 MWh. The plant will make significant contributions in meeting the increasing energy demand of Turkey. Reliable and high-quality energy will attract foreign investments to Turkey, help the country’s industries develop, create new jobs in the private sector and help increase the national income.

Completed Projects

Province: Çanakkale
District: Biga
Village: Karabiga
Parcel: 6759 (formerly 5229 and 5230)
Installed Power: 1320 MWe (2×660 MWe)​
Fuel: Imported Coal
Technology: Ultra Super Critical Pulverized Coal Technology


CENAL

Title: Cenal Elektrik Üretim A.Ş.
Address: Zeytinlik Mah. 278. Sok No.1 Karabiga Biga Çanakkale / Turkey
Telephone: +90 (286) 395 30 00 (Pbx)

Fax: +90 (286) 395 30 29
E-Mail:  info@cenal.com.tr
Web: www.cenal.com.tr